INSTITUTIONAL PROJECTS
ENLOE MEDICAL CENTER
Chico, CA
- 6 level inpatient care facility
- Poured in place walls and suspended decks
- 1 level steel frame with pan deck
- Shotcrete seismic wall upgrades to existing structures
- Over 19,000 labor hours
- 10,500 cy concrete poured
REDDING SCHOOL OF THE ARTS
Redding, CA
- Leed platinum-certified state of the art learning facility
- Polished concrete slide and playground equipment foundations
- Decorative concrete including stained, cast on, dyed and integral color
- 2 story steel structure w/pan decks
- Decorative sand blasting features
- Orchestra pits
- Stadium seating